home
docs

Equatorial Guinea Time to obtain an electrical connection (days) 2026: Interactive Chart & Historical Data

Time to obtain an electrical connection (days) in Equatorial Guinea stood at 37.87 in 2024, according to World Bank. Equatorial Guinea ranked 21st highest of the 50 countries in this dataset in 2024; Moldova ranked first.

Data source: World Bank · Category: Commodities and Energy · Explore more indicators on EconDash

Data updated:Last checked:Frequency:AnnualCoverage:2002–2025

Key facts

What is the latest Time to obtain an electrical connection (days) in Equatorial Guinea?

Time to obtain an electrical connection (days) in Equatorial Guinea stood at 37.87 in 2024, according to World Bank.

How does Equatorial Guinea rank for Time to obtain an electrical connection (days)?

Equatorial Guinea ranked 21st highest of the 50 countries in this dataset in 2024; Moldova ranked first.

Metadata for Time to obtain an electrical connection (days) in Equatorial Guinea
IndicatorTime to obtain an electrical connection (days)
CountryEquatorial Guinea
CategoryCommodities and Energy
SourceWorld Bank
Interactive chartView on EconDash
API accessEconDash API documentation

Latest value: 37.87 (2024)

Loading chart...

Cite this chart
APA

World Bank. (2026). Time to obtain an electrical connection (days) — Equatorial Guinea [Data set]. Retrieved November 13, 2026, from EconDash: https://econdash.org/chart/wdi-ic-elc-durs/GNQ. Original source: https://data.worldbank.org/indicator/IC.ELC.DURS

MLA

World Bank. "Time to obtain an electrical connection (days) — Equatorial Guinea." EconDash, 2026, https://econdash.org/chart/wdi-ic-elc-durs/GNQ. Accessed 13 Nov. 2026. Original source: https://data.worldbank.org/indicator/IC.ELC.DURS.

Chicago

World Bank. 2026. "Time to obtain an electrical connection (days) — Equatorial Guinea." EconDash. Accessed November 13, 2026. https://econdash.org/chart/wdi-ic-elc-durs/GNQ. Original source: https://data.worldbank.org/indicator/IC.ELC.DURS.

BibTeX
@misc{econdash_wdi_ic_elc_durs_gnq,
  author = {{World Bank}},
  title = {{Time to obtain an electrical connection (days) --- Equatorial Guinea}},
  howpublished = {EconDash},
  year = {2026},
  url = {https://econdash.org/chart/wdi-ic-elc-durs/GNQ},
  note = {Accessed: 2026-11-13. Original source: https://data.worldbank.org/indicator/IC.ELC.DURS}
}